🇬🇧 English
🇬🇧 English
Appearance
🇬🇧 English
🇬🇧 English
Appearance
Design and implementation of the data infrastructure for the MAPS project - Multidimensional Area Place-based System.
This document covers the following contractual deliverables:
| Task | Description | Months | Deadline | Status |
|---|---|---|---|---|
| 2.1 | Technical Architecture Design | M9-M10 | 31/03/2026 | Delivered |
| 2.2 | ETL Pipeline Development | M10-M12 | 31/05/2026 | Verification deliverable (D2.2.1) delivered; per-dataset rollout under way |
| 2.3 | Validation and Hardening | M10-M12 | 31/05/2026 | Verification deliverable (D2.3.1) delivered; per-dataset rollout under way |